1 · Who We Are
Family‑owned Creative Concrete Designs (CCD) pours structural and decorative flatwork across Montgomery County. Every slab is finished by founder Michael Goff or his lead finisher, not subcontracted.
2 · Coverage & Typical Lead Times
Area | Mobilization | Notes |
---|---|---|
Magnolia 77354‑55 | 5 business days | Same‑day site walk‑through |
The Woodlands 77380‑86 | 8‑10 days | Township HOA packets handled |
Conroe 77301‑06 | 7 days | City permitting filed by CCD |
Tomball / Hockley | 10‑12 days | Harris & Waller County inspections |
3 · Residential Concrete Menu
Project Type | Standard Spec | Upgrades |
---|---|---|
Driveways & Extensions | 4″ slab, broom finish | Integral color, scored borders |
Patios & Porches | 4″ slab, swirl finish | Stamp patterns, fire‑pit pads |
Pool Decks / Overlays | Slip‑resist sealer | Spray‑deck texture, Kool‑Deck |
Home Foundations | Mono‑slab or post‑tension | Engineered beams, pier caps |
Full descriptions on the Residential Services page.
4 · Commercial & Industrial Work
- Parking lots (3,000–20,000 ft²)
- ADA sidewalks & ramps
- Warehouse floors with laser‑level FF/FL numbers
- Machine pads with embedded anchor bolts
Details at the Commercial Concrete section.
5 · Decorative & Stamped Options
- Ashlar‑slate, herringbone brick, cedar‑plank wood‑grain
- Integral or broadcast color
- Acid‑stain borders or two‑tone water‑based dye
- Clear, low‑gloss acrylic sealer (UV stable)
See real projects in CCD’s photo gallery.
6 · Why 3500 PSI Matters
Ingredient | Purpose |
---|---|
6‑sack cement | Early strength, walkable in 24 h |
¾″ limestone agg. | Local Conroe quarry—reduces shrinkage |
Water reducer | Higher slump without added water |
Microfiber | Minimizes plastic‑shrink cracks |
7 · Project Flow
- Free estimate – schedule via the contact form.
- Fixed‑price proposal – scope, timeline, finish, payment schedule.
- Prep & forms – demo (if needed), compact sub‑grade to 95 % Proctor.
- Rebar inspection – you approve layout before pour.
- Early‑morning pour – laser screed, edge, broom or stamp.
- Cure – light foot traffic in 48 h, vehicles in 7 days.
- Final walk‑through – punch list + care sheet.
8 · 2024 Project Mix (by job count)
Category | Jobs Completed |
---|---|
Driveways | 120 |
Patios | 85 |
Foundations | 60 |
Sidewalks | 45 |
Commercial Slabs | 35 |
Decorative Overlays | 25 |
9 · Average Installed Cost – CCD vs. Regional (Mar 2025)
Scope | CCD $/ft² | Local Avg $/ft² |
---|---|---|
Driveway | 8.50 | 9.30 |
Patio | 9.00 | 10.20 |
Foundation | 6.80 | 7.50 |
Savings: $0.75–$1.40 per ft² without reducing mix strength or rebar density.
10 · Frequently Asked Questions
- How soon can you start in The Woodlands? About 10 business days after contract.
- Do you handle permits? Yes—CCD files with city/county offices as needed.
- Warranty? Five‑year workmanship on cracking/spalling beyond hairline.
- Will color‑stain work later? Yes—CCD’s standard finish accepts water‑based stains.
- Metal‑building slabs? Absolutely—includes vapor barrier & anchor bolts.
Ready for a Free Quote?
Call 832‑898‑3473 or fill out the form on the contact page—the CCD crew will be on‑site faster than fresh concrete can set.